How We Work


SURFACE PREPARATION

On existing built-up roofs, loose gravel and dirt are removed by power brooming and vacuuming. If necessary, blister and saturated areas of the existing roof are removed.

Sandblasting and/or priming are applied to metal surfaces as required.
Most roofing surfaces are also primed prior to foaming.


BASF POLYURETHANE FOAM APPLICATION

Polyurethane foam is applied with a two component proportioning machine. This provides mixing of the components in the spray gun.

The foam is applied as a liquid and rises in a matter of seconds.

Within minutes, the surface is firm enough to be walked on. The roof is sprayed to the design thickness. Flashings, penetrations and parapet walls are sprayed to form one monolithic surface. Depressions due to roof sagging can be built up by spraying to facilitate proper drainage.


BASF SILICONE COATING

After curing of the foam surface, a BASF Silicone, weather resistant coating is applied.

To ensure uniform coverage, two or more coats are normally applied.

These coatings are designed to withstand water, ultraviolet radiation and normal wear for many years of service.



© SPF Systems of Miami LLC, All rights reserved. Licensed & Insured. State License #CCC1328390